Opterra only receives the artwork and the context you submit. It does not watch your screen, pointer or viewport.
For example: "Change only the selected star from cyan to dark blue. Keep its shape, position and white background unchanged."
Every Opterra edit is reviewed separately and may receive a small correction before it is saved. A result that fails review is not applied. If the artwork changed while the edit was running, the outdated result is not applied either; start again from the version you want.
Image Studio saves the reviewed result as a new revision. In Vector Studio, turn on Inspect reviewed result before applying if you want to look before it replaces the current artwork.
Each edit uses the current artwork and the instructions you submit, not earlier messages. Changes already saved stay in the artwork, but repeat every constraint that still matters. Operator keeps a conversation if you want to plan across several steps.
Check spelling, small shapes, edges and the final print size yourself. If too much changed, return to the earlier revision, narrow the selection and ask for one change. A passed review does not replace a production proof.
Follow the Wildcats revision guide or read about creating still artwork and SVG.